Flcikerpower banner

  • Home
  • About
    • About the Authors
    • Abbreviations
    • Contact Us
  • Briefing Notes
  • Search
    • By Category
    • By Tag
  • Links
  • You are here:  
  • Home
  • Search
  • By Category
  • Renewables

More Articles ...

  1. 21.16 The Failure of RE in Europe
  2. 21.15 The Impossible Task of the Green Energy Transition with Existing Technology
  3. 21.14 The False Claims about Net Zero Progress Overseas
  4. 21.12 The Capacity of “Big” Batteries
  5. 21.11 The Downside of Electric Vehicles
  6. 21.08 Challenging the GenCost report on the cost of intermittent energy. 100% RE with firming could cost over $400 per MWhour
  7. 21.07 Intermittent solar and wind power can DISPLACE coal but cannot REPLACE it
  8. 21.02 Environment Destruction – The Dark Side to Renewable Energy
  9. 21.01 A Review of the CSIRO Gencost study 2018
  10. 20.06 Planning the Green Energy Transition. The AEMO Integrated System Plan

Page 1 of 2

  • Start
  • Prev
  • 1
  • 2
  • Next
  • End

Recent Posts

  • Environmental Issues with Construction of RE facilities
  • List of briefing notes
  • The Impending Crisis in the Power Supply
  • The Dark Side of Renewable Energy
  • An Open Letter Concerning AEMO’s 2022 Integrated System Plan

On Sale Now

"The main thrust of this book is on target. There is no. climate emergency and policies to address this non-existent threat are harmful to most of the world's people. " Will Happer

Available in print and eBook.

Copyright © 2021 Flickerpower | All rights reserved
Website by agenda